PTE Hydraulics: Reduced Lead Times and WIP with Lean Manufacturing
PTE Hydraulics, a Queensland-based manufacturer of hydraulic components, partnered with TXM to implement lean manufacturing. The result: over 30% WIP reduction and lead times cut from 60 to 14 days through Kanban, 5S, and Leader Standard Work.